Licensing Watch

CATL Opens Buenos Aires Office Amid Battery Supply Deal

By Phoebe Dixon
·
Share:
Yellow construction crane against modern buildings in Buenos Aires, with a clear blue sky.
Yellow construction crane against modern buildings in Buenos Aires, with a clear blue sky. Photo: Miguel Cuenca/Pexels

In a strategic move, CATL has established a presence in Buenos Aires with a commercial and technical office, coinciding with its supply of battery cells to Central Puerto’s Nuevo Puerto and Central Costanera projects.

These projects, with a combined power rating of 205 MW, mark CATL’s first disclosed ventures in Argentina. The office will serve as a local contact point for installation, commissioning, and maintenance activities. Argentine energy reporting identified separate sales, engineering and project management roles in the operation.

Local Presence, Regional Ambitions

This local presence aligns with CATL’s broader Latin American strategy. They recently partnered with Brazilian battery manufacturer Moura for Brazil’s capacity-reserve storage auction, demonstrating their commitment to the region’s stationary storage market.

Projects and Partnerships

The Nuevo Puerto and Central Costanera projects, with capacities of 150 MW and 55 MW respectively, are linked to distribution companies Edenor and Edesur. The sites serve different distributors, with Nuevo Puerto being the larger of the two. These partnerships connect the projects to specific parts of the Buenos Aires metropolitan network.

These projects contribute to a larger initiative aimed at adding flexibility to Argentina’s power system. The system faces challenges due to concentrated demand around Buenos Aires and growing renewable generation in other regions. Edenor and Edesur are distribution companies whose involvement connects each site to contracted services for a specific part of the metropolitan network.

Reporting on the projects says it is intended to operate under an arrangement lasting 15 years with Edenor, while Central Costanera is linked to Edesur. The same reports describe 750 MWh and 275 MWh of energy capacity, which implies a design duration of 5 hours at their stated ratings. The combined 205 MW figure is a power rating, not an annual output measure.

Market Opportunities and Challenges

Argentina’s energy-storage tender, Resolution 50/2026, presents a significant market opportunity. The AlmaGBA and AlmaSADI processes have already allocated 700.5 MW across 20 projects. Public material reviewed for this article does not disclose CATL’s equipment price, payment schedule, warranty exposure or margin on either project.

However, challenges persist. Imported equipment faces logistics, currency, and commissioning constraints. Project success also hinges on the terms agreed with power buyers and the system operator.

Central Puerto has disclosed the rated power at each site but hasn’t published equivalent figures for usable energy or earnings from dispatch.

Leave a Reply

Your email address will not be published. Required fields are marked *